Under Construction – Electrics (Part 2)

As installing all the electrics is quite some effort, we had to spend another day installing them.

This day was entirely dedicated to install all power sockets in the engineering room and the dome itself.

20181110PSimg_0424
Installing the power sockets in the engineering room. (Photo by Robert Mayrhofer, 10.11.2018)
20181110PSimg_0425
Installing the power sockets in the dome. (Photo by Robert Mayrhofer, 10.11.2018)

There are still a lot of things open, we have to do in the near future:

  • installing all switches
  • finalizing the switchboard
  • ¬†installing the lights

Some of the tasks are currently blocked by the carpenter. He has to finish the ceiling and the staircase to the dome. After this, we can install the lights and switches (some of them will be mounted directly on the staircase).

But these things are subject matter for another post, and day, dedicated to electrical installation.

Advertisements

One thought on “Under Construction – Electrics (Part 2)”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s